Construction support
Through-frame lift of 1,000 kg and room for tooling skids let the Leopard support subsea construction: monitoring lifts, operating tools and positioning structures.
How the job runs
- Launch with the TMS from the A-frame
- Monitor the lift or installation
- Operate tools and connect lines
- Record as-built video
What you get
- As-built video of the installation
- Tool operation without divers
Typical setup
- Vessel
- Construction vessel
- Crew
- 3 per shift
- Tooling
- Two manipulators, tooling skid
- Launch
- A-frame LARS with TMS
